Project Overview
Facilities Vision
Nicolet High School strives to accelerate the achievement of every student. We believe our facilities should enhance learning and improve academic performance by:
Providing a safe, well maintained, sustainable and welcoming environment that promotes student and staff wellbeing
Promoting a culture of inclusion, school pride and community partnership
Creating flexible spaces that support student and staff collaboration
Ensuring opportunities for community education and recreation
Key Areas Of Needs
The district examined the facility and campus wide needs for nearly two years. At the conclusion of the facilities study, an extensive renovation plan that addresses high priority facility needs aligned to our facilities vision was developed.
Specific and prioritized projects within each major category include:
Addressing Safety, Security, and Accessibility
Create a new, secure, main entrance with improved and controlled visitor access
Relocate District and Community Recreation Department offices for improved community access
Update restrooms, locker rooms, doors and elevator to provide Americans with Disabilities Act (ADA) access throughout the building
Updating Building Conditions and Systems
Replace major building systems such as heating, ventilation (air quality), and cooling, electrical and lighting, plumbing and sanitary pipes, fire alarms and sprinklers
Replace roofing
Replace and/or update ceilings, flooring, lockers
Remove lead and asbestos materials
Improving Learning Environments, Physical Education, and Athletic Spaces
Renovate and reconfigure science classrooms and labs
Renovate and relocate classrooms to improve collaboration between Engineering & Design, Family & Consumer Education (FCE), Business, and Visuals Arts
Renovate and relocate classrooms to better support future courses and career opportunities, including culinary, finance, construction trades, video and health/wellness
Build manufacturing labs for woods, metals, autos and robotics
Build a band room and performing arts support rooms (e.g., set design, recording, and rehearsal)
Expand physical education/wellness areas and renovate the locker, weight and fitness rooms
Renovate to create small and large group breakout & collaboration areas
Lightly renovate other classrooms and learning spaces, which may include paint, flooring, ceilings and furniture updates
Build a multi-purpose stadium with a synthetic turf field, track, restrooms, concession stand and seating for 2,500
Build 14 new tennis courts
Build a multi-purpose synthetic turf field for soccer, lacrosse and physical education
Build discus and shot put areas and reconfigure grass practice fields
Updated details on the project, including preliminary site and floor plans, will be provided when available.